Skip to content

Cost codes

Set up the codes your job cost, hours, expenses and purchase orders are charged to, starting from a list for your trade.

Cost codes are your company’s list of what money and hours are spent on: tear-off, concrete supply, rough-in labor, equipment rental. Every job uses the same list, so you can see where a job’s cost went without building an estimate first. Open it from Finance › Cost codes, or from Settings › Cost codes.

Anyone in Finance can read the list. Adding, changing and retiring codes needs the Finance settings permission.

A new company has no codes. The page offers a starter list instead.

  1. Open Finance › Cost codes.

  2. Pick your trade (general contractor, roofing, concrete, electrical, plumbing, HVAC, landscaping or painting).

  3. Select Add starter codes. You get the trade’s common codes plus four codes for work that belongs to no job: SHOP, YARD, OVERHEAD and TRAINING.

You can add another trade’s list later with Add a starter list at the top of the page. It shows exactly which codes it adds first. Codes you already have, including ones you renamed, are left as they are.

Select New code, or select a code in the list to change it. Each code has:

  • Code and Name. The code is what people pick, so keep it short. No two codes can match, ignoring capital letters.
  • Cost type: labor, material, equipment, subcontract or other.
  • Unit: optional, how installed quantities are counted (for example SQ, CY or HR).
  • Charged to: a job, or no job. A no-job code is where hours and cost that belong to no job go, so every hour still ties to a code.
  • Class: direct (the cost lands on the job) or indirect (overhead). A no-job code is always indirect.
  • Unallowable: cost that can’t be billed to a government contract or included in its overhead rates.
  • In group: optional. Put codes under a division code, such as 03-100 and 03-200 under 03-000 Concrete. Groups are one level deep.

The class and unallowable flag are the defaults for anything coded to the code. A single expense can still be set differently, and changing a code later doesn’t change records already coded.

Once any record uses a code, Charged to can’t change: an expense or line already coded to a job code would suddenly be overhead, or the reverse. The editor says so on the field. Add a new code for the other kind and retire this one.

Codes are never deleted. Select Retire on the code’s row, or Retire code in its editor. A retired code leaves the pickers but stays on every record already coded to it. Undo on the message brings it straight back, and the Retired tab lists every retired code with a Restore button.

An expense is charged to one cost code. A vendor bill is coded line by line instead (see Vendor bills).

  1. On New expense or Edit expense, pick the job first if there is one.

  2. Pick a Cost code. On a job you see the active job codes; with no job you see the codes for shop, yard, overhead and other company costs. Changing the job clears a code that no longer fits.

  3. Save. The code sets the expense to direct or indirect, and marks it unallowable when the code is unallowable. You can still change either on the expense’s Cost classification card.

To change the code later, open the expense and select Change (or Add) beside Cost code. Once the expense is approved, the change needs a reason. The old code, the new one, the reason and your name stay on the expense’s activity, and the job’s cost updates straight away.

On Finance › Expenses, the Cost code filter finds expenses and bills by code, and Not coded lists the ones still to code. The code shows under the category on each row.

Each estimate line can carry a job code: the work it prices. When the estimate becomes the job’s budget, its lines are already coded.

  1. In the estimate builder, select the More button (the three dots) at the end of a line.

  2. Pick a Cost code. Estimate lines take job codes only, so codes for shop, yard and overhead are not offered.

  3. Save the estimate. The code shows first in the small line under the line’s description.

Anyone who can edit estimate lines can code them, without access to Finance. A duplicated estimate keeps each line’s code. Imported quantities arrive uncoded.

Each line of a purchase order can carry a code, charged the order’s way, the same rule as an expense:

  • On an order for a job, the line takes one of the job codes.
  • On an order with no job, it takes a code for shop, yard, overhead or another company cost. Stock bought for the warehouse is usually left uncoded: it is coded when it goes to a job.

Pick the code under each line’s item on New purchase order or Edit. Changing the order’s job clears the line codes that no longer fit; saving records which lines lost their code. The order’s page shows each line’s code under the item.

When goods on an order for a job are received straight to that job, the stock that goes to the job carries the line’s code.

On Move stock › Issue to job, pick a Cost code under the job. It applies to every line of that issue and offers the job codes only. Leave it empty to issue the stock uncoded. A return comes off under the code its issue carried.

On a booking’s Day-end usage drawer, a line for a job has its own Cost code picker under the job. Charge-code lines (shop, yard, overhead) carry no cost code. A correction keeps the line’s code while it stays on the same job, and when the usage posts to the job’s cost it carries the code with it. Reversing or moving a posting carries the same code, so a code’s total stays right.

Open a job’s Budget tab and look for By cost code. Each code shows its Budget (from the estimate’s coded lines, bid plus accepted change orders), Actual (everything posted to the job under the code: labor, materials from stock, equipment, expenses and bill lines, and cost adjustments) and Variance (budget minus actual; red when over). Uncoded is the last row. The rows always add up to the job’s cost to date.

Seeing it needs the same permissions as the job’s other costs. A revised budget is one number, so it isn’t split by code; budget here is always the estimate’s.

  • Codes can’t yet be picked on punches. That picker arrives next and will use this list. Until it does, a job’s hours show under Uncoded in By cost code.