Inspections
Run quality, safety, commissioning and closeout inspections on a job from your company's templates, answer each item pass, fail or N/A with notes and photos, and sign to close it.
An inspection is a checklist walked on site: a pre-pour, a weekly safety walk, a closeout walk with the owner. Each item is answered Pass, Fail or N/A, with a note and photos where they help, and the inspector signs it to close it. Open Inspections in the Work menu to see every inspection across your jobs, or a job’s Inspections tab for that job’s log.
Templates
Section titled “Templates”Inspections → Templates holds your company’s templates. A template has a name, a type (Quality, Safety, Commissioning, Closeout or Other), and sections of items. Each item is one thing to check, with optional guidance for the inspector.
- New template builds one. Add sections and items, and move them with the arrow buttons.
- Duplicate copies a template so you can make a variant.
- Archive hides a template from Start inspection without changing anything already started. Restore brings it back.
- Remove takes it out of the library. Inspections started from it keep their items.
Only people who can edit jobs can change templates. Everyone who can see jobs can use them.
Start an inspection
Section titled “Start an inspection”Press Start inspection on the Inspections page or on a job’s Inspections tab. Pick the job and the template, and optionally a title, where on site, who it’s assigned to and a due date. The person you assign gets a notification. You can start an inspection on a job you’re on; people who can edit jobs can start one on any job.
Answer the items
Section titled “Answer the items”Open the inspection and answer each item with Pass, Fail or N/A. When you answer the first item, the inspection moves to In progress.
- Add note to say what you saw. A failed item opens the note so you can say what needs fixing.
- Add photo takes or picks a photo for that item. Photos are stored in the job’s Files too.
- Who answered each item, and when, shows under it.
Edit details changes the title, place, assignee and due date while the inspection is open. The person who started it, the assignee, and anyone who can edit jobs can do this.
Sign and close
Section titled “Sign and close”When every item is answered, press Sign and close. Type your full name, draw your signature (or type it instead), tick I inspected these items myself and the answers are true, and sign. A signed inspection is final: its answers can’t change. It shows Passed when nothing failed and Failed when at least one item did.
Re-inspect what failed
Section titled “Re-inspect what failed”A failed inspection offers Start re-inspection. It starts a new inspection on the same job with only the items that failed, linked to the original. The original stays as it was signed.
Void withdraws an inspection that was started by mistake or twice. It needs a reason, stays on the record, and can’t be reopened. Only people who can edit jobs can void, and a signed inspection can’t be voided.
The report
Section titled “The report”Download PDF prints the inspection: every item with its answer, note and who gave it, how many photos back each item, and the signature. An inspection that isn’t signed yet prints with a note saying so.
Finding inspections
Section titled “Finding inspections”The Inspections page shows how many are open and overdue, how many failed, and the pass rate. Its views are Open, Assigned to me, Overdue, Failed, Completed, Void and All. Filter by type and job, or search by title, place or job.
You can also ask Rook, for example “which inspections are overdue?” or “what failed on last week’s pre-pour?”.