Submittals

Log the product data, shop drawings and samples a job's spec asks for, route each one through its reviewers in order, and keep every revision and answer on the record.

A submittal is something the spec asks you to send for approval before you buy or build it: product data, shop drawings, samples, test reports, warranties, O&M manuals. Each one goes through reviewers in order (often your PM, then the GC, then the architect or engineer), and comes back approved, approved as noted, or sent back for another revision.

Opsidian keeps the submittal log for every job: each submittal’s number, spec section, revision, who holds the ball, and when the next move is due.

  1. Open Work › Submittals and choose New submittal, or open a job’s Schedule tab and choose New submittal on the Submittals card.
  2. Give it a title the way the spec book names it, its spec section and its type.
  3. Pick the submittal manager: the person who prepares it, resubmits it when it comes back, and distributes it once approved.
  4. Fill in the schedule: the day it is required on site, the lead time to make and ship it, and the review time reviewers need. Opsidian works out the submit by day from those. You can also set it by hand.
  5. Add the distribution list: who gets the approved copy (your foreman, the site super, the supplier).
  6. Set the review workflow: who signs off, in order. Everyone on step 1 reviews first, and step 2 starts once they have all answered. A reviewer comments only and doesn’t hold up the step. You can give each person days to answer.
  7. Choose Log submittal. It gets the job’s next number and starts as a draft.

Numbers are never reused on a job. An archived submittal keeps its number.

Attach the files in the submittal’s Files card, then choose Send for review. Say when it went out, how, and to whom, and tick the files that went with it. The first send is revision 0. The ball moves to the people on step 1.

When a reviewer answers, choose Record answer on the submittal. Pick whose answer it is, the answer, and the day they gave it. A reviewer on your team can record their own answer on their step.

  • Approved or Approved as noted moves it to the next step. When the last step approves, the submittal is approved and the ball comes back to the submittal manager.
  • Revise and resubmit or Rejected ends this revision right away and the ball comes back to the submittal manager. Say why: the reviewer’s comment stays on the record.

Answers are never edited. Who answered and who entered the answer are kept apart.

  • After a send-back, choose Resubmit. It goes out as the next revision, and the earlier revision and its comments stay in the history.
  • Once it is approved, choose Record distribution to note who got the approved copy and which files, then Close it.
  • Hand to someone moves the ball by hand when the work moved outside the normal steps (a supplier redrawing a part, for example). You say why.
  • Print transmittal makes a PDF with the submittal, its workflow and answers, and its history, for the GC’s file or the job binder.

The submittal log shows Open, With me, Overdue and Closed views. A submittal is overdue when it is ours to send and the submit-by day has passed, or when a reviewer is past the days their step allows. Use Group to see the log by ball in court, spec section or job.

People on your team are told in Opsidian when a submittal reaches their step or comes back to them.